Provincial

Ontario Premier Doug Ford Unveils Lake Ontario Sign Following Trump's Name Change Order

Ontario Premier Doug Ford unveiled a Lake Ontario sign at a park on Saturday, responding to U.S. President Donald Trump's executive order to rename the lake to 'Lake America.' Ford asserted that the name 'Lake Ontario' would remain unchanged in the eyes of the world. Trump's order specifically affects U.S. federal usage and does not apply to Canadian or international references to the lake.

about 2 months ago • 6 Canadian Sources Corroborated
Listen
Listen to this article synthesis
Audio narration of the published summary.
Developing • Merged from 6 Canadian reporting desks.

On Saturday, Ontario Premier Doug Ford unveiled a large sign displaying the name 'Lake Ontario' at a park located on the shores of this Great Lake. This move comes just two days after U.S. President Donald Trump signed an executive order aiming to rename the lake to 'Lake America.' Ford expressed his commitment to preserving the historic name of the lake, which has been in use for over 400 years, stating that the world will continue to recognize it as Lake Ontario, irrespective of U.S. actions. The executive order from Trump pertains solely to U.S. federal designations, meaning it does not impact Canadian naming conventions or the perspectives of international bodies. Additionally, as part of this transition, Google Maps has begun displaying 'Lake America' for users in the United States, showcasing the administrative implications of Trump's decree even as local and regional responses emphasize the continuity of the original name in Canada.

Analyzed Canadian Outlets (6)

6 headlines

Ford dévoile un panneau au lac Ontario en riposte à Trump
1 outlet
Ford says world will always ‘call it Lake Ontario’ after Trump’s renaming - Global News
1 outlet
Google Maps displays Lake Ontario as Lake America in US
1 outlet
Google Maps to display Lake Ontario as Lake America in U.S.
1 outlet
Huge ‘Lake Ontario’ sign installed in swipe at Trump over name change
1 outlet
“Now and Always”: Doug Ford unveils Lake Ontario sign amid U.S. tariff war
1 outlet