Politics

COMMENTARY: The true cost of diesel power to Prince Edward Island

Energy planning in P.E.I. should be just that, planning – done with the future in mind. Right now, it seems that Maritime Electric isn’t interested in planning. They’re interested in ramming through $353 million for a 100 MW ProEnergy fossil-fuel generation project, using refurbished turbines converted from aircraft...

14 minutes ago • 1 Canadian Sources Corroborated
Listen
Listen to this article synthesis
Audio narration of the published summary.
Developing • Merged from 1 Canadian reporting desks.

Energy planning in P.E.I. should be just that, planning – done with the future in mind. Right now, it seems that Maritime Electric isn’t interested in planning. They’re interested in ramming through $353 million for a 100 MW ProEnergy fossil-fuel generation project, using refurbished turbines converted from aircraft...

Analyzed Canadian Outlets (1)

1 headline

COMMENTARY: The true cost of diesel power to Prince Edward Island
1 outlet